Resources |
Lesson 1: Introduction (HTML5, 4:52) |
- Terminology
- Drilled Shaft Equipment
- Construction Process
- Construction Materials
- 455 Specifications
- Inspector Duties
|
Lesson 2: Equipment and Tools (HTML5, 23:28)
|
- Identify drilled shaft rig components.
- Identify drilling tools and explain their uses.
- Identify and interpret applicable 455 specifications.
|
Lesson 3: Drilled Shaft Installation Process (HTML5, 49:41) |
- Describe the Section 455 methods of drilled shaft installation.
- Describe typical/potential construction problems associated with drilled shaft installation.
- Identify and interpret the applicable 455 Specifications.
|
Lesson 4: Construction Documents (HTML5, 58:11) |
- Locate Plan Sheet Details Related to Drilled Shafts.
- Calculate REC Percentage and RQD.
- Identify key elements of the Drilled Shaft Installation Plan.
- Identify and interpret applicable 455 Specifications.
|
Lesson 5: Contractor and Equipment Arrive On-Site (HTML5, 26:47) |
- Identify and understand the Role and Duties of the Inspector.
- Verify and Inspect On-site Equipment.
- Verify Protection of Existing Structures is implemented.
- Identify the applicable 455 Specifications.
|
Lesson 6: Shaft Excavation and Cleaning (HTML5, 01:02:07) |
- Perform inspection of drilled shaft excavations for compliance to plans, tolerances and cleanliness.
- Perform visual field verification of soil/rock material for comparison to supplied soil boring data/logs.
- Sample and test slurry and fluid in the excavation.
- Calculate Elevations and Extra Shaft Lengths.
- Identify the applicable 455 Specifications.
|
Lesson 7: Reinforcing (HTML5, 27:04) |
- Describe cage construction.
- Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers.
- Explain how to assess the Contractor’s compliance with cage construction/placement requirements.
- Verify CSL tube placement and condition.
- Identify the applicable 455 Specifications.
|
Lesson 8: Concreting (HTML5, 01:10:47) |
- Describe typical tremie and pump placement methods.
- Verify Contractor compliance with project documents for concrete placement.
- Utilize the Concrete Placement Log inspection form, determine theoretical concrete volumes, and plot placed concrete volume curves.
- Identify the applicable 455 Specifications.
|
Lesson 9: Post Installation (HTML5, 44:32) |
- Identify and describe various Integrity and Load Tests.
- Construction tolerances.
- Describe the Drilled Shaft Pay Items.
- Identify the applicable 455 specifications.
|
|
Lesson 10: Homework (HTML5, 15:30)
|
- This section contains review questions for you that will help you prepare for the exam.
|
|
|
Accessibility Page
|
Web Policies and Notices
|
|
|
|
This site is
maintained by the Florida Department of Transportation
ODO Multimedia, located at 605 Suwannee Street, Tallahassee FL 32301. For additional
information, please e-mail questions or comments to
Susan Robeson at
Susan.Robeson@dot.state.fl.us or call (850)414-4492.