Drilled Shaft Inspector Course CBT

Resources

Lesson 1: Introduction (HTML5, 4:52)

  • Terminology
  • Drilled Shaft Equipment
  • Construction Process
  • Construction Materials
  • 455 Specifications
  • Inspector Duties

Lesson 2: Equipment and Tools (HTML5, 23:28)

  • Identify drilled shaft rig components.
  • Identify drilling tools and explain their uses.
  • Identify and interpret applicable 455 specifications.

Lesson 3: Drilled Shaft Installation Process (HTML5, 49:41)

  • Describe the Section 455 methods of drilled shaft installation.
  • Describe typical/potential construction problems associated with drilled shaft installation.
  • Identify and interpret the applicable 455 Specifications.

Lesson 4: Construction Documents (HTML5, 58:11)

  • Locate Plan Sheet Details Related to Drilled Shafts.
  • Calculate REC Percentage and RQD.
  • Identify key elements of the Drilled Shaft Installation Plan.
  • Identify and interpret applicable 455 Specifications.

Lesson 5: Contractor and Equipment Arrive On-Site (HTML5, 26:47)

  • Identify and understand the Role and Duties of the Inspector.
  • Verify and Inspect On-site Equipment.
  • Verify Protection of Existing Structures is implemented.
  • Identify the applicable 455 Specifications.

Lesson 6: Shaft Excavation and Cleaning (HTML5, 01:02:07)

  • Perform inspection of drilled shaft excavations for compliance to plans, tolerances and cleanliness.
  • Perform visual field verification of soil/rock material for comparison to supplied soil boring data/logs.
  • Sample and test slurry and fluid in the excavation.
  • Calculate Elevations and Extra Shaft Lengths.
  • Identify the applicable 455 Specifications.

Lesson 7: Reinforcing (HTML5, 27:04)

  • Describe cage construction.
  • Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers.
  • Explain how to assess the Contractor’s compliance with cage construction/placement requirements.
  • Verify CSL tube placement and condition.
  • Identify the applicable 455 Specifications.

Lesson 8: Concreting (HTML5, 01:10:47)

  • Describe typical tremie and pump placement methods.
  • Verify Contractor compliance with project documents for concrete placement.
  • Utilize the Concrete Placement Log inspection form, determine theoretical concrete volumes, and plot placed concrete volume curves.
  • Identify the applicable 455 Specifications.

Lesson 9: Post Installation (HTML5, 44:32)

  • Identify and describe various Integrity and Load Tests.
  • Construction tolerances.
  • Describe the Drilled Shaft Pay Items.
  • Identify the applicable 455 specifications.
 

Lesson 10: Homework (HTML5, 15:30)

  • This section contains review questions for you that will help you prepare for the exam.
 


Accessibility Page

Web Policies and Notices

 

ODO logo (opens new browser window)

This site is maintained by the Florida Department of Transportation ODO Multimedia, located at 605 Suwannee Street, Tallahassee FL 32301. For additional information, please e-mail questions or comments to
Susan Robeson at Susan.Robeson@dot.state.fl.us or call (850)414-4492.
Report technical problems to the FDOT Service Desk: 1-866-955-4357 or e-mail FDOT Service Desk.